Mithra

A firm AI tier on your gas island, with your miners as its reserve.

Mithra is the engineering and control partner for Bitcoin hosts on islanded and behind-the-meter gas. We size the protection and battery, commission the controls and license the software that keeps GPUs powered when an engine trips, a training job swings or the fuel gas sags. You keep the site and the miners. The GPUs belong to whoever finances them. Mithra owns neither.

One of two gensets trips. Here is the bus over the next three seconds.

  • Software curtailment only: bus lost at 0.32 s, AI load dropped
  • 81U relay, 500 kW battery and Mithra: nadir 57.39 Hz, rides through
Synthetic model, not a site measurement. Reference site: two 1.5 MW lean-burn gas gensets at 60 Hz, no grid, 680 kW of priority AI load (256 GPUs plus cooling) and 1.31 MW of Bitcoin miners. Dashed lines are typical genset under-frequency trips: below 57 Hz for 2 s, or below 54 Hz at once.

Where Mithra fits

Select a category to see where it sits on a site.

Four kinds of company are bringing AI to cheap power. None of them is built for a host who already runs Bitcoin on an islanded gas bus and wants to add GPUs without handing the site over. That host is who we work for, alongside the builders and GPU channels already in the picture.

Single-line diagram of an islanded Bitcoin site with an AI tier: two gensets and a battery feed the site bus; the bus feeds a miner feeder with an 81U relay and an AI feeder with GPU servers; the grid tie is open; Mithra's supervisory control sits above and signals the gensets, battery, miners and GPUs. Mithra supervisory control G1 G2 BESS 81U islanded site bus Bitcoin miners the reserve GPU servers the firm tier grid open
Blue dashed lines are Mithra's control signals. Protection (the 81U relay, battery and genset controls) acts on its own, without Mithra.
  • Owner-operators Different job

    Build, own and run their own compute sites and sell the capacity to AI buyers. They want the site. We help you keep yours.

  • Modular builders We work with

    Sell gensets, power skids, containers and mining load centres. We specify the relay, battery and controls around their equipment, whichever brand you run.

  • Grid-flexibility software Different job

    Makes grid-connected AI sites flexible for the utility. On an island there is no grid to flex against, so your miners take that role.

  • GPU channels We work with

    Plan, finance and operate GPUs for site owners and bring the tenants. They bring the GPUs and demand. We make your power firm enough to sign for.

  • Mithra

    The control layer for Bitcoin islands that already run. Vendor-neutral across gensets, batteries and miner firmware, with the miners as the reserve and the island-bus engineering shown in the open.

Three events decide whether GPUs can live on your bus

Miners tolerate a bad second. GPUs under a training contract do not. With no grid behind the gensets, any gap between generation and load shows up as bus frequency within milliseconds, long before it shows up as missing kWh.

  • Genset tripdecided in 0.32 s

    When one of two engines trips, the survivor faces 1,985 kW against a 1,500 kW rating and the bus is lost in 0.32 s. No curtailment command to the miners lands in that window, at any API latency from 0.25 to 10 s. This is a hardware job: an 81U relay on the miner feeder plus about 400 kW of grid-forming battery, or about 700 kW of battery without the relay.

  • AI training swingsevery few seconds

    Synchronous training steps move a 480 kW GPU block between 30 % and 100 % of its draw. Lean-burn engines answer in seconds, so with no battery the bus swings between 59.1 and 60.6 Hz on every step, enough to trip a tight relay on routine work. A 500 kW battery holds it near 59.8 to 60.2 Hz.

  • Fuel-gas sagover about a minute

    Available output falls from 3.0 to 1.8 MW over 60 s. A 10 s loop that sheds one miner at a time loses the bus 58 s in. A 1 s loop that sheds straight to the engines' headroom holds 59.9 to 60.1 Hz with no battery. That 1 s layer is Mithra.

All figures from Mithra's synthetic island-bus model of the reference site above. A real site will differ; measuring how is the first step of every engagement.

Two speeds, with clear authority

No software can act inside the first 300 ms after a trip, so Mithra does not try to. Hardware holds the bus in milliseconds. Mithra works from one second to minutes, and coordinates GPU power caps so the largest swings are known before they happen.

Protection relay and grid-forming battery, 20 to 250 ms
Mithra supervisory loop, 1 s to minutes
GPU power caps, set ahead of job starts
Which layer acts when, on a logarithmic time scale. The red line marks the moment a genset trip is decided on the reference site.

Hardware protection

milliseconds

A grid-forming battery absorbs load steps and engine trips. A two-stage 81U relay drops the miner feeder. Your protection engineer and genset OEM set and own it.

Never depends on software, a network or the cloud.

Mithra supervisory

1 s to minutes

Reads genset kW, frequency, fuel limits and battery power and charge. Sheds miners straight to a headroom target, holds them asleep after a relay trip and restores at a rate the engines can take.

Never the only safety function. On stale data it holds, then sheds.

GPU power caps

set ahead of known swings

The tenant's job scheduler asks Mithra to pre-cap GPUs before a job starts, and the cap is released in steps the engines can follow.

Never used as protection: caps take too long to apply.

Why frequency alone is not enough: behind a battery, frequency stays near normal while the battery drains. In the model, a shed-below-59 Hz rule never fires, the battery empties after about 61 minutes, and then the bus goes. Mithra's loop reads engine headroom and battery charge, not just frequency.

Replay all three events with your own battery and latency

What an AI tier earns you, against keeping that power on miners

Every input is an assumption you can change. Nothing here is a quote.

Firm power and space for investor-owned GPUs, billed per kW of AI load each month.

The share of contracted kW the tenant pays for whether it draws it or not.

Fleet you would give up on that power

Default from Hashrate Index, 23 Nov 2026.

Net uplift per year, before Mithra's fees

USD 294,078

The AI tier earns more than mining at this price.

Per year, for the AI load you set
AI tier billings1,224,000
Mining revenue given up on that power−594,375
Your AI-tier hardware and running cost−335,547
Net uplift, before Mithra294,078
Mithra's fees, averaged over 3 years−44,750
Yours after Mithra's fees249,328

USD. Negative figures are costs to you.

Your break-even AI price

USD 95.6 per kW-month

USD 91.2 without Mithra's fees. Below this, keep mining.

Mithra's fees over 3 years

USD 134,250

15.2 % of your 3-year net uplift.

Study 38,500 less the 50 % credit (19,250) + integration 55,000 + licence 20,000 a year × 3.

What the calculator assumes. Mining: hashprice converted to USD per MWh at the fleet efficiency, 2.5 % pool fee, miners running 95 % of hours. AI tier: price × floor × 12 months on every kW of AI load. Your AI-tier cost per MW of AI load: a 1 MW / 1 MWh grid-forming battery (USD 450k), an 81U relay (USD 40k) and connectivity (USD 155k), recovered over 5 years at 12 %, plus about USD 157k a year of insurance, SLA administration and connectivity running cost. GPUs are owned by an investor or the tenant, so they are not in your costs. Mithra's fees follow the price list below. These are planning assumptions from Mithra's own model; the readiness study replaces them with your site's numbers.

What we deliver

  1. AI-tier readiness study

    USD 38,500NOK 380,000, fixed. 50 % credited against integration if you sign within 6 months.

    Four to six weeks. We calibrate the island-bus model on your recorded data: bus frequency and per-genset kW, protection settings, curtailment commands against the miner feeder meter, fuel pressure. You learn how many MW of firm AI the site can carry, the battery and relay it needs, your real miner release time, and whether your break-even price is reachable. Read-only data export: no site access and no software installed.

  2. Integration

    USD 55,000 per siteUp to 1.5 MW of AI load, plus USD 20,000 for each further started MW. Travel at cost.

    81U relay staging and settings with your protection engineer and genset OEM, who decide and implement. Battery specification. Mithra configuration and commissioning. GPU power-cap coordination with the tenant. A witnessed acceptance test: load step, simulated fuel sag and a protection-test trip of the miner feeder.

  3. Mithra licence

    USD 20,000 per MW a yearPer MW of AI load, minimum 1 MW per site, 3-year term, billed quarterly.

    Software updates, remote monitoring, support in business hours and one re-tune a year. 24/7 on-call is not included today.

What we do not do

  • Own GPUs or sites, or sign tenant contracts on your behalf.
  • Put protection in software. The relay, battery and genset controls act in milliseconds without Mithra.
  • Produce stamped protection-coordination, short-circuit or arc-flash studies.
  • Guarantee uptime. We state what your site can and cannot ride through.

Built, and not yet proven

Built and tested

  • The controller is open source on GitHub: darkknight4563/mithra. Your engineers can read every line before it touches a site.
  • 143 automated tests, run against simulated gensets, batteries, miners and GPUs.
  • Drivers for Modbus TCP gensets, SunSpec batteries, NVIDIA GPU power caps and miner firmware over the CGMiner API (Braiins OS, LuxOS).
  • The 1 s shed-to-target policy, tested against the island-bus model.
  • The island-bus model, the public replay and a three-page engineering note (PDF).

Not yet proven

  • Not calibrated on a real site. Every figure on this page comes from a synthetic model with indicative parameters.
  • The 1 s policy has not run on live equipment.
  • No driver reads the 81U relay or miner-feeder breaker status yet.
  • Genset capacity registers, battery sign and scale on a real PCS, and GPU cap permissions and latency are unverified on hardware.
  • No 24/7 on-call team.

Who we are

Mithra is Ali Emadi, an engineer in Oslo who moved from drilling and process plants into control software.

  • Applications engineer at Baker Hughes, North Sea drilling operations
  • Process engineer at Aker Solutions
  • M.Sc. in Process Technology, University of Bergen

Talk about a site

If you run Bitcoin load on islanded or behind-the-meter gas and want to know whether a site can carry a firm AI tier, write to

CEO.Gatekeeper@outlook.com

What to send us. A rough answer to each is enough for a first reply.

  • Site sizeGenset capacity in MW and today's miner load.
  • Genset modelMake, model and count, and the controller they use.
  • BatteryWhether you have one, and its kW and kWh if so.