Back to Mithra

Mithra · Engineering replay · Synthetic, indicative parameters

Can an AI load ride through a bad second on an islanded gas site?

A 2 × 1.5 MW lean-burn gas site carries 680 kW of priority AI load (256 GPUs plus cooling) and a 1.31 MW Bitcoin fleet as the swing load. Choose an event and a control architecture, then watch the bus frequency. On an island, a power shortfall appears as frequency within milliseconds, long before it would show up as missing kWh.

Frequency nadir
Frequency peak
Max rate of change
Battery energy delivered
AI energy lost while bus down

Bus frequency

Bus frequency57 Hz protection threshold59.3 Hz miner-feeder relay pickup

Power on the bus

Genset outputBattery (+ discharge)Miner drawAI + cooling served

Model and assumptions

Aggregate swing equation with per-unit isochronous PI governors. Engine power follows the governor through a 0.6 s lag, and increases are rate-limited to 25 %/s of rating. That is tuned so a 25 % load step dips the frequency about 6.6 % and recovers in about 5 s, and dropping 45 % of load overshoots about 6.3 %. Both are inside the range lean-burn gas gensets are specified for. Inertia is H = 1.0 s per genset, which is deliberately generous: real reciprocating sets are often lower, and that makes every result here worse. Loads are constant-power with no frequency damping. The battery is modelled as a grid-forming inverter with fast frequency droop (full output at 0.5 Hz, 30 ms response) and 1 MWh of usable energy. The bus is treated as lost below 54 Hz, or below 57 Hz for more than 2 s, or above 66 Hz. These are typical genset protection ranges, and real site settings vary.

ArchitectureBehaviour
Mithra todayThe current open-source controller. It runs a 10 s loop, sheds one miner per loop below 59 Hz and all miners below 57.5 Hz. Commands land after the API latency.
Supervisory onlyA 1 s loop that sheds the miner fleet to a target (85 % of online engine capacity minus maximum priority load) and restores at 50 kW per second while frequency is healthy.
Two-speedAn 81U under-frequency relay opens the miner feeder at 59.3 Hz (0.2 s clearing). Mithra then holds the miners asleep, recloses the feeder and restores to target.

Not modelled: voltage and reactive power, governor load-sharing errors, GPU power-supply ride-through limits, fuel-system dynamics beyond the available-power cap, and network latency jitter. This is a synthetic comparison of architectures, not a calibrated plant study.